Risk Allocation And Dispute Resolution Under Fidic-Based EPC Contracts In India: Reconciling International Standard Forms With Domestic Law
Adv. Mohammed Nabeel Uddin, LL.M. (Construction Law & Arbitration), Aurora University
ABSTRACT
India has a huge emphasis on infrastructure. The Engineering, Procurement and Construction (“EPC”) contract has become the prevalent procurement model for projects like highways, metro rail, power and water. Public Authorities like National Highways Authority of India have come out with model EPC agreements that draw heavily from the FIDIC standard forms. These international forms, drafted for a neutral common-law setting, do not always sit easily with Indian contract, arbitration and public procurement law. This article looks at three sources of friction. First, it discusses how EPC pricing and Indian modifications to FIDIC shift ground, design and change- in-law risk to the contractor. Second, it asks whether the time-bar and notice provisions in a FIDIC-style form are enforceable in light of Section 28 of the Indian Contract Act, 1872. Third, it asks whether the tiered dispute resolution mechanism (including the Dispute Avoidance/Adjudication Board) is enforceable in light of the Arbitration and Conciliation Act, 1996 and recent Supreme Court judgments on the limitation on judicial interference with awards. The article advocates that rather than abandoning FIDIC, India should mindfully adapt it through balanced risk allocation, binding interim adjudication and specialised construction benches if the promise of speedy, predictable dispute resolution is to be realised.
Keywords: EPC Contracts; FIDIC; Risk Allocation; Time-Bar Clauses; Dispute Adjudication Board; Construction Arbitration; Section 34; Infrastructure Law.